Project

General

Profile

Feature #1273

Feature #1318: UML

Feature #1275: Prepare UML Draft Design For UML Team

Configuration Task for UML Team

Added by Htar Aung THET 5 months ago. Updated 4 months ago.

Status:
Resolved
Priority:
Normal
Start date:
12/12/2024
Due date:
12/19/2024 (about 4 months late)
% Done:

100%

Estimated time:
2.00 h

Description

Once the UML team members have grasped the necessary mathematical concepts, the next step is to focus on the configuration process. This involves:
System Calibration
Parameter Optimization
Testing and Validation

#1

Updated by Htar Aung THET 5 months ago

  • Assignee set to Satvik Reddy KONDA
#3

Updated by Htar Aung THET 5 months ago

  • Parent task set to #1318
#4

Updated by Htar Aung THET 5 months ago

  • Parent task deleted (#1318)
#5

Updated by Htar Aung THET 5 months ago

  • Parent task set to #1275
#6

Updated by Satvik Reddy KONDA 4 months ago

  • % Done changed from 0 to 100
#7

Updated by Satvik Reddy KONDA 4 months ago

  • Estimated time changed from 1.00 h to 2.00 h
#8

Updated by Htar Aung THET 4 months ago

  • Status changed from New to Resolved

Also available in: Atom PDF