[23rd October 2025] (Week 4)

Sub-team Responsibilities
- Talked about the sub-teams within the team and how they will work with other sub-teams, as well as their responsibility as a sub-team.

Class Diagram Discussion
- Began discussing the class diagram with the whole group.


[30th October 2025] (Week 5)

Update Current issues / features

- Talked with each sub team to inquire their progress and update the Issue on Redmine.

Tested the current iteration of the code

- Borrowed the projectors as well as testing how the two images blend with different interpolation mode ( linear, quadratic, gaussian ), as well as different values for the formula parameters.

Discussed additional features
- The features for blending 2 videos as well as an implementation of the GUI were discussed.

Rough implementation for GUI and video blending

- The codes for GUI and video blending were created. Due to time constraints, there were still some bugs and the code kept crashing on some of the team member’s laptop.


[6th November 2025] (Week 5)

Doxygen Documentation
- The Doxygen sub team finishes up commenting on the code to create the html

Jira research
- The Jira sub team decided to add images into the report to show differences of the GUI

Video and Image testing
- Continue testing the program to try sync up the video as well as making sure everything works correctly

UML Diagram
- Modify the UML diagram to make It the same as the code, and finalize the UML class diagram


Updated by Pratama Kwee BRANDON about 18 hours ago · 16 revisions