Feature #1318
UML
Start date:
12/12/2024
Due date:
01/09/2025 (about 4 months late)
% Done:
100%
Estimated time:
(Total: 6.00 h)
Subtasks
Added by Htar Aung THET 5 months ago. Updated 4 months ago.
100%
Subtasks
The UML Team is responsible for creating and managing the design documentation for the project. The tasks include:
Understand the Math Behind the Project:
Review and understand the mathematical concepts relevant to the project to ensure accurate representation in the design.
Configuration Setup:
Perform the required configuration setup for design tools and environments.
Prepare UML Draft Design:
Create a draft version of the UML diagrams, including class diagrams, sequence diagrams, activity diagrams, and other necessary design artifacts.
Create UML Diagrams:
Finalize and refine the UML diagrams based on the project requirements and feedback.
Skeleton Code Generation:
Use the UML diagrams to create a preliminary version of the project’s skeleton code, ensuring it aligns with the design structure.